Tripler Army Medical Center Central Plant Retrofit

Engineer of record and commissioning agent for the retrofit and complete controls upgrade for an existing 2,820-ton central plant.  Two 900-ton chillers were removed and replaced and the DDC was retrofitted. For the DDC retrofit, the existing points and controllers were identified as being changed and a new sequence of operation was provided that optimized this plant for optimum energy usage.

This project was interesting because the large energy optimization component put a great deal of emphasis on the sequence of operations.  Commissioning was performed to the UFGS Specification 23 08 00.00 10 for the Army Corps of Engineers.