Houston Zoo McNair Asian Elephant

As part of the largest undertaking in the 85-year history of the Houston Zoo, the Phase Two Expansion of the Asian Elephant Habitat consists of an open steel LSS structure, an 80,000-gallon capacity eight-foot-deep pool structure, a shade structure, and cable barrier containment around the perimeter of the Exhibit.

The Elephant Habitat features a 7,000 sf Elephant Barn, a high bay structure with a steel-framed roof, metal deck and open web steel joists/girders, steel pipe bollard and gate systems for containment and steel-framed “chute” structure for health and medical procedures. The project is the cornerstone of the Houston Zoo’s Masterplan and is integral to the African Tropical Forest Exhibit.

Industries:

  • Commercial & Retail

Services:

  • Structural Engineering
  • Seismic Engineering